Plans

Design of the Centre Section

Posted on Updated on

March 4 2016: Over the last two weeks I have been questioning the design of the top wing centre section. My question first came from my incorrect reading of the plans for the front cabane attach points of the fuselage. What I thought the plans were saying was to have a single front sway wire. This was in part influenced by a photo I had seen in a thread in the Biplane Forum.

Turns out that the sway wire fittings are a dual pair of wires, not a single.

What I did uncover in the course of this is that the sway wire design changed in 2006. This occurred when some hand drawn Curtis Pitts plans were changed to CAD. The biggest change was the sway wires moved from the centre section rear spar to the front spar. A whole heap of debate ensued and it will result in me modifying the plans and moving the sway wires to the rear as per the Pitts model 12.

If you want to see the whole story have a look at this thread. This is really worth a read if you are considering building the three piece delta wing. Make up your own mind!!  Biplane forum R&D Design

Drawings & Plans

Posted on Updated on

To start the build I ordered the plans for SteenAero. This is a Delta Wing so I needed to order the Delta Supplement. This will make building the wings a little easier and Manualadd to total weight due the reduced spar length.

Plans arrived and lots to learn and read about.

8th September 2015 – 1 hour read plans and update with notes from the Steen Aero Builders manual

13th September 2015 – .8 hour.  Set up builders log on iPad. Subsequently I finished using this app and built the website as a record.
13th September 2015 – .5 hour. Ordered the Skybolt Builders log from BiPlane forum website. Look for Beej (username) he has them for USD $35 – good value and full of good tips.

Total Time – notes and revisions
– 2.3 Hours